- InquiryWho: You· Day 1
You Reach Out
Submit a quote request online, call 907-215-1927, or use the 3D designer to configure a building and submit directly. At this stage we just need the basics: approximate size, location, intended use, and timeline.
Outputs from this step
- Project intake notes
- Preliminary feasibility discussion
- RequirementsWho: Superstructures· 1–3 business days
Josh Reviews Your Project
Josh Kingery reviews your project details and reaches out — usually within 24 hours on business days. He may have questions about your site, specific requirements, or timeline. This is a real conversation, not a form acknowledgment.
Outputs from this step
- Follow-up call or email
- Clarifying questions answered
- DesignWho: Superstructures + You· 1–2 weeks (custom) / 1–3 days (package)
Preliminary Configuration
Working from your requirements, Josh develops a preliminary building configuration: dimensions, eave height, door count and locations, roof system, and any special structural requirements. For package buildings, this phase is short. For custom builds, it may involve multiple rounds of refinement.
Outputs from this step
- Preliminary building layout
- Preliminary budget estimate
- Package selection or custom configuration
- EngineeringWho: Varco Pruden (via Superstructures)· 2–4 weeks
Structural Engineering & Stamped Drawings
Once the configuration is agreed, Superstructures submits it to Varco Pruden for structural engineering. Varco Pruden's in-house engineering team designs the building to Alaska-specific snow, wind, and seismic requirements for your site. The result is a full set of stamped engineering drawings.
Outputs from this step
- Stamped structural drawings (for permitting)
- Anchor bolt plan
- Column reaction loads
- Foundation specifications
- ReviewWho: You· 1–2 weeks (your review)
You Review & Approve Drawings
Superstructures sends you the engineering drawings for review. Check every dimension, door location, and framed opening carefully. Changes after this point add cost and delay. Confirm accuracy before approving for manufacturing.
Do not rush this step. This is your last chance to catch dimensional errors without extra cost.
Outputs from this step
- Your written approval to proceed
- OrderWho: You + Superstructures· Day of approval
Order Placement & Deposit
Upon your approval, Superstructures places the manufacturing order with Varco Pruden. A deposit is required at this time — typically a percentage of the package price. The deposit amount and payment schedule will be agreed in your contract with Superstructures.
Outputs from this step
- Signed purchase agreement
- Deposit payment
- Manufacturing slot confirmed
- ManufacturingWho: Varco Pruden· 8–14 weeks
Building Fabrication
Your building is fabricated at the Varco Pruden manufacturing facility. Primary framing is cut, welded, and painted. Panels are roll-formed. Secondary framing and accessories are packaged. Every component is labeled to match your engineering drawings.
Outputs from this step
- All structural steel fabricated
- Panels, trim, and accessories packaged
- Anchor bolts included
- Erection drawings prepared
- ShippingWho: Shipping carrier (coordinated by Superstructures)· 2–4 weeks
Alaska Delivery
Your building package ships from the manufacturing facility to Alaska. Road-accessible sites receive truck delivery. Coastal communities may require barge. Superstructures coordinates shipping logistics. You need to ensure your site is accessible and you have a delivery point ready.
Final payment is typically due before shipment.
Outputs from this step
- Flatbed truck delivery to your site or freight terminal
- Bill of lading and component manifest
- DeliveryWho: You· Delivery day
Receiving Your Building
When your building arrives, count every piece against the shipping manifest. Note any damage on the freight documentation before signing. Contact Superstructures immediately if anything is missing or damaged — freight claims must be documented at delivery.
Inspect every bundle and crate at delivery. Freight damage is common and must be documented on-site.
Outputs from this step
- Signed delivery receipt
- Damage documentation if applicable
- ErectionWho: Your contractor (separate from Superstructures)· Project-dependent (2–5 days for a 40×60)
Building Erection
Your erection contractor puts up the building using the erection drawings included in your package. Every component is labeled to match those drawings. Superstructures provides technical support by phone and email during erection. The erection itself is outside Superstructures' scope but we're here to help when questions arise.
Outputs from this step
- Structural steel erected
- Panels installed
- Building weather-tight
- CompleteWho: Superstructures· Ongoing
Post-Erection Support
After erection, Superstructures can help with warranty questions, missing components, or technical issues. The 25-year Varco Pruden structural warranty begins at erection. Document your erection completion date.
Outputs from this step
- 25-year structural warranty active
- Warranty registration (verify requirements)